Home / Projects

Completed projects

Stages, roofs, tribunes and rigging installations already working for our clients in Poland and across Europe.

Completed Project
CYPRUS 2023Concert hall 34×86 m, Limassol

Temporary concert hall for an IT-sector client: 34 m clear span, 86 m long, 8 m walls, 14 m apex. Engineering, supply and supervised installation by EZEKEN, erected in 21 days. The structure is assembled for a three-month season and dismantled until the next year, with high roof load capacity for rigging equipment.

Completed Project
GEORGIA 2024Load-bearing structure for a TV show set

Steel structure 26×11×10 m supporting a video wall and TV show scenery. Built from standard components and fitted simultaneously into the arena envelope and the modular grid of the video screens. Ten performer rooms were created inside on different levels, with walkways and stairs. Engineering, supply and supervised installation in 4 days.

Completed Project
GEORGIA 20251,800-seat grandstand for Guns N' Roses

Spectator grandstand seating 1,800, including 360 VIP seats, built for a Guns N' Roses concert. Client: a concert operator. Engineering, supply and supervised installation by EZEKEN, erected in 3 days.

Completed Project
QATAR 2022Rigging grid for World Cup events

Roof rigging system with a 24×20 m grid at 14 m trim height, serving events during the football World Cup. Client: a rental company. Engineering and supply by EZEKEN; thanks to preparation, the structure was raised in a single day.

Engineering Concept
AviationBusiness-aviation hangar, 33 m span

Engineering concept: a demountable large-span structure with aircraft doors, insulated envelope and relocation capability.

Proposed Solution
IndustrialTemporary logistics warehouse 24×60 m

Proposed solution: a fast-assembly warehouse with truck doors, lighting and phased expansion.

Completed Project
Roof systemFestival main stage

COVEX L roof system with PA towers, 8 t grid, 34 m span.

Completed Project
RiggingConcert hall - GIS rigging

24 D8+ hoists, group control, technical crew training.

Completed Project
TrussCustom grid for an exhibition pavilion

Hi-Load trusses to a custom design, turnkey installation.

In Development
Roof systemCOVEX hangar 25×25 m for Gulfstream G650

COVEX truss frame with a 25 m span on R+ support towers sized to the aircraft tail height, fitted with a 25 m wide sliding gate for nose-in access. Roof trusses and side bracing are rated for the snow and wind loads of the operating region.

Completed Project
StageStage complex with truss rigging system and tribunes

40x12m stage with multi-level deck ranging from 0.5 to 3.5m, Truss rigging system carrying PA/LIGHT towers and hung equipment. Audience tribunes and VIP zones covering 1000 m².

Ready to discuss your project?

Tell us about your task - we will come back with a concept, load calculations and a commercial offer.

This site uses only technical cookies and anonymous visit statistics without storing IP addresses. Learn more - Privacy Policy.